In modern production lines, the dispensing pump acts as the “heart” enabling precise fluid control. Its long-term stable and reliable operation is directly linked to consistent product quality and smooth production flow. However, even the highest quality equipment will see its precision and lifespan significantly compromised without scientific, standardized daily maintenance. Establishing and executing an effective daily maintenance protocol is key to ensuring the dispensing pump sustains excellent performance, reduces failure rates, and saves overall costs.
I. Periodic Maintenance: Establishing a Preventive Maintenance System
1. Prevention is better than cure, especially for precision dispensing equipment. It is recommended to establish maintenance plans for daily, weekly, monthly, and other cycles based on usage frequency and adhesive properties.After Daily Operation: Cleaning is the primary task at the end of a production run or when changing adhesives. Always use dedicated cleaning solvents compatible with the adhesive to thoroughly flush the pump interior, fluid pathways, and dispensing valve according to the manufacturer’s recommended procedure. Preventing any adhesive residue from curing inside the system is the most common cause of clogging and wear. After cleaning, wipe the pump exterior to keep the equipment clean. Simultaneously, perform a simple check for any loosening at air and electrical connections.
2. Weekly or Bi-weekly Check: Conduct a more systematic inspection. Key focuses include:
a. Seal Inspection: Check for signs of adhesive leakage around piston rod seals, diaphragm, or progressive cavity pump sealing areas. Minor leaks can gradually affect accuracy and eventually lead to failure.
b. Preliminary Wear Part Check: For progressive cavity pumps, listen for smooth and even operation. For piston pumps, monitor for smooth running.
c. Air & Power Supply: Check the air supply system. Ensure the air filter-regulator-lubricator unit is functioning correctly, drain water from air tanks, and guarantee stable pressure with a dry, clean air source. Verify electrical connections are secure.
3. Monthly or Quarterly In-depth Maintenance: Perform preventive part replacement and in-depth calibration based on usage intensity.
a. Regular Replacement of Wear Parts: Such as sealing rings, O-rings, diaphragms, check valve cores, etc. Replace these at recommended intervals even if no obvious damage is visible, as slight aging of these components directly impacts dispensing accuracy and consistency.
b. Lubrication of Moving Parts: Apply suitable lubricating oil or grease to mechanical parts requiring it, such as guide rails and lead screws, as per the manual.
c. Accuracy Calibration: Recalibrate the pump’s metering accuracy using standard weights or flow test tools to ensure its output consistently meets process requirements.
II. Targeted Maintenance Skills for Key Components
l Different types of dispensing pumps have distinct maintenance priorities:For Progressive Cavity Pumps: The core is protecting the screw and stator pair. Never run dry, as dry friction can cause instant damage. During cleaning, ensure the solvent adequately lubricates the interior before briefly operating at low speed. Regularly inspect the screw for wear; excessive wear leads to decreased output and increased pulsation.
l For Piston Pumps: Focus on piston rod cleanliness and sealing. After each cleaning, inspect the piston rod surface for smoothness, free of adhesive residue. Any adhered material will accelerate seal wear. Ensure the drive mechanism (e.g., lead screw, guide rail) that moves the piston is clean and properly lubricated.
l For Time-Pressure Pumps: Maintenance focuses on pressure stability and the dispensing valve. Ensure a stable, clean air supply. Regularly check the dispensing needle valve for responsive operation and seal integrity. Replace worn needles or pins.
III. Operational Habits and Runtime Environment Management
1. Excellent maintenance also relies on good daily operational habits and environment management.Standardize Operating Procedures: Before startup, ensure the feeding system (pressure pot, syringe) is correctly connected and has sufficient adhesive to avoid drawing in air. During operation, monitor for abnormalities in equipment sound, pressure gauge readings, etc. During shutdown, always execute the complete cleaning procedure.
2. Adhesive Management: Adhesive storage conditions (temperature, humidity) must comply with datasheet specifications. Before use, condition (e.g., warm up) and stir if necessary to ensure adhesive homogeneity, preventing abnormal pump wear or clogging due to adhesive issues (e.g., crystallization, separation, bubbles).
3. Environmental Control: Maintain the dispensing work area as clean as possible to minimize the risk of dust entering the system. Control ambient temperature within the ranges required for both the equipment and the adhesive. Excessively high temperatures may affect adhesive properties, while excessively low temperatures can increase viscosity, placing greater load on the pump.
4. Record Keeping and Traceability: Maintain detailed maintenance logs, recording the date, content, replaced parts, and any issues found for each service. This aids in analyzing failure modes, predicting part lifespan, and providing data support for future maintenance planning.
IV. Fault Warning and Emergency Response
Another key goal of maintenance is the early detection of potential failures. Operators should be trained to recognize common warning signs: unstable output, abnormal dot/bead shape, unusual noises or vibrations, unexplained pressure fluctuations, and adhesive leaks. Upon observing these signs, stop the machine immediately for inspection rather than continuing operation, to prevent minor issues from escalating into major failures.In summary, a high-performance dispensing pump embodies the technology and expertise of its manufacturer, while ensuring its long-term stable service is a reflection of the user’s responsibility and professional capability. Transforming daily maintenance from a reactive “fix-upon-failure” approach to a proactive “preventive maintenance and health management” strategy can not only minimize unplanned downtime and safeguard product quality but also significantly extend equipment service life, maximizing production efficiency. Investing in meticulous maintenance is an investment in production continuity and product excellence.
Your email address cannot be published. Required fields are marked*



No comments